Coalescing of New & Existing Structures
The new rear and the existing front sections were coalesced by providing continuity in the floor slabs.
Following this, the shoring and propping systems used for the existing structure were removed systematically in stages to allow for forming and constructing the above set slabs.
Neilly Davies also incorporated the provision of a vehicle turn-table, the installation of rainwater tanks and a passenger lift in the basement design.