| |
More photos
<< 2
3 4
>>
|
Shoring, Propping & Excavation of Three-level Structure
Secondly, the car park design involved excavating below ground level under the existing house.
This created challenges in the design of temporary shoring and propping works which were required to completely suspend the existing floors for excavation for the car park below. This was achieved by designing and installing propping and shoring systems using a steel framework, custom-designed by Neilly Davies for the entire of the existing building.
read more
|
|
|
- See more of our
previous projects, find out more about our
engineering services or read our
client testimonials -
For more information about our civil & structural engineering projects or how Neilly Davies Consulting Engineers can make your project a reality, email:
info@neillydavies.com.au or call us now on 1300 730 340
|